The challenge

With the expansion of Terminal 2, which had quadrupled its original length, Incheon International Airport sought to improve passenger flow in the terminal
02

The solution

Otis installed of 20 elevators, 80 escalators and 72 moving walkways, including Asia’s longest continuous moving walkway at 136 meters
Delivered quality and safety through advanced technical capabilities and rigorous quality assurance.
03

The result

Otis designed an innovative, synchronized dual-motor system to improve operational efficiency and provide seamless operation
Airport infrastructure upgrades increased the airport’s annual passenger capacity from 77 million to 106 million