Logo
PROAVIA member use case

How can an airport replace an obsolete control tower with a modular solution?

Mayotte · DZA  – 2026
01

The challenge

Replacing in record time an obsolete control tower at a lower cost on an international airport that is planned for relocation within 10 years.
02

The solution

Assembling a modular building based on stacked converted shipping containers.
03

The result

A tool perfectly suited to air traffic controllers.
25 m² Air Traffic Control Room compliant with DGAC and international standards.
Adapted technical facilities, offices and a comfortable break room.
Exporter ce cas d'usage Générer un rapport PDF complet
Générer le PDF